No
|
Description of the Project
|
Company
|
Category
|
1
|
Jogja Eco Park (Eco Wisata), Jln. Kaliurang km 8, Candibinangun, Yogyakarta, Indonesian, that covered more than 20 hectare.
|
PT. Jogja Eco Park
|
Analisis Mengenai Dampak Lingkungan/AMDAL (Environmental Impact Assessment/EIA)
|
2
|
Jetty and Fuel Storage Terminal
Located in Kaitehu, Motaulun, bazartete, Liquica that covered 30.000 m2 (in land) and 100 m of catwalk jetty and 13,08 m width (in the coastal to the sea)
|
Lai-Ara Nikmat Mujur, L.da
|
A (PD, ToR, EIS and EMP Document)
|
3
|
Jetty and Fuel Storage Terminal
Construction of Jetty and Fuel Storage Tank that located in Kaitehu, Motaulun, Bazartete, Liquica. Main jobs in implementing OHSAS, JSA, HIRAc and HAZOP’s including safety introduction about the project activities to worker for reduce or minimalize the accident.
|
Lai-Ara Nikmat Mujur, L.da
|
QHSE, HIRAC AND HAZOP’S
|
4
|
Hotel Novo Turismo Resort & Spa
Hotel and Restaurant that covered 7.570 m2 (0,75 hectare) that located in Bidau, Lecidere, Dili
|
Novo Turismo, L.da
|
A (PD, ToR, EIS and EMP Document)
|
5
|
Dili Central/Timor Plaza Buildings
The Exiting Dili Central as we know Timor Plaza Buildings, that located in, Bebonuk, Dili, covered 59.237 m2 (5,9 hectare)
|
Dili Development Company, L.da
|
A (PD, ToR, EIS and EMP Document)
|
6
|
Central Garden Residence
Located in Aldeia 20 de Setembro, Bebonuk, Dili, that covered 14.992 m2 (1,4 hectare).
|
Central Garden Investment, L.da
|
B (PD, SEIS & EMP)
|
7
|
Quarry and Crusher Stone Activities
Monitoring and collecting data about air quality, noise level in project site, and groundwater quality, for Quarry activities that located in Beduku, Comoro, Dili
|
Carya Timor Leste (BTK) Company
|
B (SEIS & EMP)
|
8
|
Quarry, Crusher Stone and AMP
Monitoring and collecting data about air quality, noise level in project site, and groundwater quality, for Quarry activities that located in Beduku, Comoro, Dili
|
Jonize Company
|
B (SEIS & EMP)
|
9
|
Quarry, Crusher Stone and AMP
Monitoring and collecting data about air quality, noise level in project site, groundwater quality, and surface water, for Quarry activities in Lak-Lo, Manututo.
|
Montana Diak Pty. Ltd
|
B (PD, SEIS & EMP)
|
10
|
Fishery Center (fishing industry)
Preparing Project Document and Environmental Management Plan (EMP) for Industry of Fishing (Fisheries) that covered 2.779 M2 in Bebonuk, Dili.
|
KOICA-Ministry of Agriculture and Fishery, Implemented by TI & KO Unip. L,da
|
C (Project Document and Simple EMP)
|
11
|
Quarry and Crusher Stone Activities
Preparing the Environmental Impact Assessment (EIA) such as preparing the Project Document (PD) and Simplified Environmental Impact Statement (SEIS) and Environmental Management Plan (EMP) document about Quarry and Crusher Stone that covered 33.755 M2 located in, Motaikun, Municipality of Liquica.
|
Marabia, Pty. Ltd
|
B (PD, SEIS & EMP)
|
12
|
Villa and Apartment
Prepared the Environmental Management Plan (EMP) and Simplified Environmental Impact Statement (SEIS) including environmental studies (noise level, wastewater management, air quality, social assessment, soil analysis and water quality)
|
Vila Mataruak, L.da
|
B (PD, SEIS & EMP)
|
13
|
Fuel Station
The main responsibilities is: prepare the Project Document and Environmental Management Plan (EMP) document including collecting data in the field such as: air quality, noise level, groundwater, surface water, population affected including another environmental baseline data, the project located in Liquica city.
|
Alexa Fuel, L.da
|
B (PD & EMP)
|
14
|
Quarry Project
Prepare the PD, EIS and EMP document for quarries activity that located in Suco Motaulun, Post Administrative of Bazartete, Municipality of Liquica
|
China Harbor Engineering Company/CHEC
|
A (PD, ToR, EIS & EMP)
|
15
|
Gas Filling Station
Preparing the Project Document (PD) and Environmental Management Plan (EMP) document about activities of gas-filling that located in Tibar, Liquica.
|
VIP GAS Company
|
B (PD & EMP)
|
16
|
Bahao Fuel Station
Monitoring and collecting data about air quality (P.M10-2.5, wind direction, wind speed, CO2, temperature, humidity, O2, NO2, H2S and SO2) and measuring noise level (dBA), the project located in Baucau.
|
Bahao Fuel Station, L.da
|
B (PD & EMP)
|
17
|
Rural Road Rehabilitation
Rural road rehabilitation from Tokoluli-Leorema 16,025km. in this project our team handle 3 position such as:
- Safety officer: safety introduction to worker, preparing and implementing the traffic sight, monitoring the all worker to used PPE and mitigate the hazard will be give an impact to public and worker
- Geotechnical engineer: Soil analysis and design including modeling of the slope stabilization
- Social safeguard: consultation to the communities, faces to face and meet the communities to minimize the social unrest from rehabilitation of road, and also mitigates including pay the trees, used the land and others.
|
The project funded by ADB and Shanghai as the Contractor.
|
ENGINEER, SAFETY AND SOCIAL SAFEGUARD
|